SB 9 in Menlo Park (2026): Can You Split Your Lot or Build a Second Home?
Last updated: October 2026 · By the Atlas General Construction team (CSLB #1059664), Menlo Park, CA
Short answer: Yes — most single-family lots in Menlo Park’s R-E, R-E-S, R-1-S and R-1-U zones can use California’s SB 9 to build a second primary home on the lot, or to split the lot into two and build up to two homes on each. Approval is ministerial (staff-level, no public hearing), and since SB 450 took effect on January 1, 2025, the city must approve or deny a complete application within 60 days. Menlo Park is updating its SB 9 ordinance in 2026, so confirm current standards with the Planning Division before you design.
Key facts at a glance
| Question | Menlo Park answer (as of Oct 2026) |
|---|---|
| Which zones qualify? | R-E-S, R-E, R-1-S, R-1-S (FG), R-1-U, R-1-U (LM) |
| Two-unit project (no split) | Up to 2 primary homes on one lot |
| Urban lot split | 1 lot becomes 2; up to 2 primary homes per new lot (4 total) |
| SB 9 + ADUs (no split) | Up to 4 units: 2 primary homes + 2 ADUs |
| Minimum new lot size | 1,200 sq ft, and neither lot smaller than 40% of the original |
| Owner occupancy | Lot splits require an affidavit to live in one unit for 3 years |
| Short-term rentals | Not allowed — rentals must be 30+ days |
| Review type | Ministerial (no hearing); 60-day decision deadline under SB 450 |
What SB 9 actually lets you build
SB 9 is a state law that took effect in 2022. It requires cities to allow two housing paths on single-family lots without discretionary review:
- A two-unit development. You keep one lot and build a second primary home — or replace the existing house with a duplex. This is often the simplest route for families who want a home for parents or adult children that is larger than an ADU.
- An urban lot split. You divide one parcel into two separate legal lots, each of which can then hold up to two primary units. Because the new lots can be sold separately, this is the path most homeowners ask about when they want to unlock land value.
On a lot you are not splitting, Menlo Park allows SB 9 and ADU rules to be combined for up to four units: two primary homes and two ADUs. If you only need one extra unit, an ADU is usually faster and cheaper — see our Menlo Park ADU construction page for that path.
What changed with SB 450 (2025)
SB 450, signed in September 2024 and effective January 1, 2025, closed several loopholes cities had used to slow SB 9 projects:
- 60-day shot clock. Cities must approve or deny a complete SB 9 or lot-split application within 60 days, or it is deemed approved.
- Written corrections. A denial must list every deficient item and explain how to fix it.
- No stricter standards than the zone. Cities cannot apply objective design or zoning standards to SB 9 homes that don’t apply uniformly to other homes in the same zone.
- Lot-split standards narrowed to those related to the design or improvements of the parcel.
Menlo Park’s 2026 ordinance update — what to watch
Menlo Park’s SB 9 rules live in Municipal Code Chapters 15.31 (lot splits) and 16.77 (two-unit projects). The Planning Commission held study sessions in spring 2026 (continued from April 27 to June 8) to bring the code in line with SB 450 and to consider streamlining single-family review on substandard lots — including removing use-permit requirements for substandard lots and for establishing a floor area limit on lots under 5,000 sq ft. No final action had been taken at those sessions; staff is returning with revisions.
What this means for you: if your lot is small or substandard, the rules that apply to you may get simpler. Talk with the city and your builder about timing before you lock in a design.
Restrictions that rule a project out
- A lot already created by an SB 9 split cannot be split again under SB 9.
- You cannot use SB 9 to split adjacent lots you own (alone or with others).
- Full demolition isn’t allowed for deed-restricted below-market-rate units.
- Menlo Park’s streamlined SB 9 process does not cover a simple demolition and rebuild of a single-family home — that follows the normal residential process.
- Properties in very high fire hazard zones, flood zones, historic districts, or with protected habitat face additional state-law limits. Check your parcel first.
Step-by-step: how an SB 9 project works in Menlo Park
- Feasibility check (1–2 weeks). Confirm zoning on the city’s GIS map, pull a boundary and topographic survey, and review utilities, trees, easements and access. This is where most projects are won or lost.
- Pre-application meeting. The city recommends talking to a planner before applying. For a lot split, also speak with the Engineering Division.
- Design and engineering. Architectural plans, structural engineering, Title 24 energy compliance, and grading and drainage for split lots.
- Submittal. Two-unit projects are submitted as building permits through the city’s online portal. Lot splits go through Engineering with a parcel map.
- Ministerial review. Staff checks your plans against objective standards — no hearing, no neighbor appeal on design.
- Construction and inspections. Utilities, foundation, framing, systems, finishes, final.
SB 9 vs. ADU: which is right for your lot?
| ADU | SB 9 two-unit | SB 9 lot split | |
|---|---|---|---|
| Can be sold separately? | Generally no | No (same lot) | Yes |
| Size | Capped by ADU rules | Full primary home | Full primary homes |
| Owner-occupancy rule | No | No | Yes, 3 years |
| Complexity | Lowest | Medium | Highest (survey, parcel map, utilities) |
| Best for | Rental income, in-law unit | Multigenerational living | Unlocking land value |
Where costs come from on SB 9 projects
We don’t quote SB 9 prices in the abstract, because the biggest cost drivers are site-specific: separate utility connections (sewer laterals, water meters, PG&E service), driveway and access requirements, tree protection, grading and drainage on split lots, survey and parcel-map work, and whether the existing house stays. A feasibility visit typically surfaces these in one walkthrough — and it is the cheapest money you will spend on the project.
Frequently asked questions
Do I have to live on the property to use SB 9 in Menlo Park?
For an urban lot split, yes: you must sign an affidavit that you intend to live in one of the units as your primary residence for at least three years from the split date. A two-unit project on an unsplit lot does not carry that requirement.
Can neighbors stop an SB 9 project?
Not on design grounds. SB 9 projects are reviewed ministerially against objective standards, so there is no public hearing or discretionary design review.
How long does Menlo Park have to approve my application?
Under SB 450, 60 days from a complete application. If the city misses it, the application is deemed approved.
Can I rent the new units on Airbnb?
No. SB 9 units in Menlo Park must be rented for terms of 30 days or longer.
Can I combine SB 9 with ADUs?
On a lot that is not split, yes — up to four units total (two primary homes and two ADUs).
Talk to a Menlo Park builder who handles the whole process
Atlas General Construction is a licensed general contractor based at 101 Jefferson Drive in Menlo Park. We manage SB 9, ADU and new home construction in Menlo Park end to end — feasibility, design coordination, structural engineering, permits, construction and final inspection — with one project manager as your point of contact. Request a free feasibility estimate or call (650) 509-9826.
Sources: City of Menlo Park SB 9 Projects page and Planning Commission notices (April and June 2026); California HCD SB 9 fact sheet; Burke, Williams & Sorensen, “SB 450 Modifies and Strengthens SB 9.” This article is general information, not legal advice — rules change, so verify with the city before you design.